Client: Karachaganak Integrated Organisation (KIO)
General Contractor: Vegyepszer Zrt. (Hungary)
Contractor: JS Company “Montazhspetsstroy”
Construction area: Aksai, Burlinskiy district, West Kazakhstan oblast, Republic of Kazakhstan
Contract execution period: 1999 – 2002
Man-hours liquidated under the Contract – 450,000 man-hours
Contract Scope of Work includes: detailed design, fabrication and supply of 57 industrial buildings of different purpose (compressor facility, pump houses, boiler houses, etc.):
- for KPC – 39 buildings;
- for OPF-2 – 18 buildings
Engineering: Design work, including foundations, steel frames, HVAC utilities, Electrical, Instrumentation for HVAC system
Fabrication and Supply:
Subcontracting for fabrication and supply of materials and equipment:
- anchor bolts;
- steel structures;
- electrical trays and racks;
- equipment for HVAC system
Inspection during materials and equipment manufacturing, expediting, customs clearance, warehousing in the territory of the construction site and preservation of materials and equipment